Embassy Works
-
Astana Embassy Kancilarya Residence and Officer Housing Project
Scope of Project: Whole High and Low Voltage Electrical Works (With Material)
Project Location: Astana - Kazakhstan
Project Start / Finish Date: 13.08.2000 / 30.12.2001
Prime Contractor: T.C. Astana Embassy
-
USA Kabul Embassy
Scope of Project: Whole High and Low Voltage Electrical Works (With Material)
Project Location: Kabul - Afghanistan
Project Start / Finish Date: 09.12.2010 / 30.12.2011
Prime Contractor: Tepe Metag J.V.
-
Holland Embassy Building
Scope of Project: Whole High and Low Electrical Works (With Material)
Project Location: Kabul - Afghanistan
Project Start / Finish Date: 23.10.2009 / 26.09.2010
Prime Contractor: Metag İnşaat
-
T.C. Astana Embassy and Embassy Residence Buildings
Scope of Project: Whole High and Low Electrical Works (With material)
Project Location: Astana - Kazakhstan
Project Start / Finish Date: 08.02.2008 / 31.12.2009
Prime Contractor: Yapı Uluslararası İnşaat ve Dış Ticaret A.Ş.
-
USA Embassy EOB Building, WH/650, CAF/REC Building
Scope of Project: Whole High and Low Electrical Works (With Material)
Project Location: Kabul - Afghanistan
Project Start / Finish Date: 06.01.2006 / 01.02.2007
Prime Contractor: Metiş - Epik Partnership
-
Kazakhstan Embassy Building
Scope of Project: Low Voltage Electrical Works (With Material)
Project Location: Ankara - Turkey
Total Area: 2.794 m2
Project Start / Finish Date: 02.07.2002 / 2003
Prime Contractor: Ulusal İnşaat Taah. A.Ş.