Industrial and Technological Facilities

  • Adapazarı Waste Water Refining Facility

    Scope of Project: Whole High and Low Voltage Electrical Works (With Material)

    Project Location: Adapazarı - Turkey

    Project Start / Finish Date: 16.04.1999 / 2000

    Prime Contractor: Metiş Makina İmalat San. Ve. Tic. A.Ş.

  • Milicon Waste Water Refining Facility

    Scope of Project: Whole High and Low Voltage Electrical Works (Workmanship)

    Project Location: Tarin Kowth - Afghanistan

    Project Start / Finish Date: 17.08.2012 / 17.10.2012

    Prime Contractor: Metag A.Ş.

  • Kandahar Kaf Power Distribution

    Scope of Project: Power Distribution

    Project Location: Kandahar Afghanistan

    Project Start / Finish Date: 30.10.2009 / 30.04.2010

    Prime Contractor: Metag A.Ş.

  • Dusseldorf Hassels Main Server Center

    Scope of Project: Whole High and Low Voltage Electrical Works (With Material)

    Project Location: Dusseldorf - Germany

    Total Area: 12.000 m2

    Project Start / Finish Date: 14.04.2000

    Prime Contractor: Rhein Elektra Technik A.G.

  • Continuous Secondary Power Boost Electrical Works

    Scope of Project: Whole High and Low Voltage Electrical Works (Workmanship)

    Project Location: Kabul - Afghanistan

    Project Start / Finish Date: 18.03.2004 / 18.09.2004

    Prime Contractor: ZMD İnşaat ve Mühendislik Ltd. Şti

  • Kabil Pol-E Chakrhi Radio Station

    Scope pf Project: Whole High and Low Electrical Works (With Material)

    Project Location: Kabul- Afghanistan

    Total Area: 800 m2

    Project Start / Finish Date: 17.12.2002 / 2003

    Prime Contractor: ZMD İnşaat ve Mühendislik LTD. ŞTİ

  • Kazan Steel Factory

    Scope of Project: High Voltage Electrical Works and Illumination Installment Works

    Project Location: Ankara Turkey

    Project Start / Finish Date: 29.10.2001 / 2001

    Prime Contractor: Bir Yapı İnşaat

  • Türk Telekom Gölbaşı Satellite Earth Station

    Scope of Project: Whole High and Low Electrical Works (With Material)

    Project Location: Ankara Turkey

    Total Area: 6.000 m2

    Project Start / Finish Date: 19.01.2000

    Prime Contractor: Insat İnşaat San. Ve Tic A.Ş.